Firstly, our technicians dismounted, hauled away and recycled old insulation. Then they installed a new HVAC 821TA60090V21 according to the building standards so that HVAC-system installation consist of installations of new furnace, new evaporator coil, new outdoor condensing unit and new refrigerant line set. During this project we installed:
Gas Furnace - Bryant 821TA60090V21 Preferred 80 Series Variable-Speed Gas Furnace 2 STAGE;